Bhatvadia power project ( Saurashtra Super Thermal Power Plant )

Project developer Universal Crescent Power received an Environmental clearance for Phase 1 of the power station in 2012, comprising two 660-MW coal plants. It is also pursuing a second and third phase for the power station, both also 2 X 660 MW.

As of 2014 Universal Crescent is seeking environmental clearance for a jetty and seawater intake pipe for the 6×660 MW power station.

Flipkart IN

 Project Details of proposed expansion

Sponsor: Universal Crescent Power
Location: Bhatvadia village, Kalyanpur taluk, Jamnagar district, Gujarat
Coordinates: 22.467, 70.067 (Approx)
Status:

  • Phase 1: Permitted
  • Phase 2: Announced
  • Phase 3: Announced

Capacity:

  • Phase 1: 2 X 660 MW
  • Phase 2: 2 X 660 MW
  • Phase 3: 2 X 660 MW

Type: Supercritical
MoEF permits:

3 thoughts on “Bhatvadia power project

  • April 8, 2017 at 11:53 am
    Permalink

    dear Sir,

    Our product list.

    a) MOSAIC MIMIC CONTROL PANEL – SCOPE
    1. POWER GENERATION PROJECT
    2. RAILWAY SIGNALLING & TRAFFIC CONTROL
    3. HYDRO POWER PROJECT.
    4. STEEL PLANT.
    5. POWER TRANSMISSION & DISTRIBUTION ETC.

    b) BREAKER CONTROL SWITCH WITH DISCREPANCY INDICATION LED TYPE
    c) FLASHER RELAY – 30V. 110V. 220V AC / DC
    MAIN CUSTOMER
    1) CROMPTON GREAVES LTD.
    2) AMARAJA POWER SYSTEMS
    3) EASUN REYROLLE LTD
    4) MSEB – MAHARASHTRA ELECTRICITY BOARD
    5) WEST BANGAL ELE. CITY BOARD. ETC.

    d) TEST TERMINAL BLOCK. (TTB)
    MAIN CUSTOMER
    1) C & S ELECTRIC
    2) ABB LTD.
    3) BCH
    4) SAHARA COMBINED ETC.

    e) ANNUNCIATION WINDOW & FACIA
    MAIN CUSTOMER

    1) SIEMENS LTD.
    2) INDUCTOTHERM
    3) S S CONTROLS ETC.